
Rapid tooling today, a mould you can still run in five years
Steel moulds designed, built and validated in house — then production moulding on the same tool, so what you approve is what you receive.
From prototype to 100,000 shots
A mould is only as good as its first article. We build tooling in our own tool room, run a first-article inspection against your drawing, and only then release production. If the part needs a design tweak, we tell you before the steel is cut, not after.
Rapid aluminium tools get you moulded samples in about two weeks for bridge production. Hardened steel tools are built for volume and validated with a documented sample report.
- Tooling in 10–15 working daysSimple single-cavity tools; complex multi-slide tools quoted with a schedule.
- Mould life 100k–500k shotsP20, 718H and S136 steel depending on resin and volume.
- Moulded samples before volumeT1 samples with dimensional report and cosmetic assessment.
Choose the mould that matches your volume
We will tell you honestly when a cheaper tool is the right call — and when it will cost you more later.
Rapid aluminium tool
10–14 days, lower cost, 5k–20k shots. Ideal for bridge production and market testing.
Single-cavity steel tool
P20 or 718H, 100k–300k shots. The default for most consumer and industrial parts.
Multi-cavity & family tool
2–32 cavities with hot runner, or several parts in one tool to cut cycle cost.
Overmoulding & insert moulding
TPU grips on PC shells, threaded inserts and metal contacts moulded in place.
DFM & mould flow
Draft, wall thickness, gate location and warp risk reviewed before cutting steel.
Tool transfer
Existing moulds moved to us for lower-cost production, with trials and repairs included.
Moulding envelope
| Specification | What we offer |
|---|---|
| Clamping force | 50 – 650 tonnes |
| Tooling lead time | 10–15 working days (rapid), 20–30 days (steel) |
| Mould materials | Aluminium 7075, P20, 718H, S136, H13 |
| Mould life | 5,000 – 500,000 shots |
| Tolerance | ±0.05 mm typical, ±0.02 mm on critical features |
| Maximum part | 1200 × 800 × 500 mm, 6 kg shot weight |
| Cavitation | 1–32 cavities, hot runner or cold runner |
| Volume | 500 – 1,000,000 pcs per year |
Swipe sideways to see all columns →
Resins we mould daily
Glass-filled, flame-retardant and medical grades available on request.
Commodity
Engineering
Specialty
Tooling, from design freeze to T1
Design review
Parting line, draft angles, gates and cooling reviewed with your team.
Tool design & steel order
3D mould design approved by you before machining begins.
Tool build & T1 samples
Cavity machining, polishing, assembly and first shots in 10–15 days.
Validation & production
Samples measured and signed off, then batch moulding to schedule.
Tooling decisions are expensive to get wrong.
Send your part model and annual volume — we will recommend rapid or steel tooling with the cost per part for each.